Theme: Electricity Generation

Future Energy

In Future Energy, each player attempts to construct a network of non-carbon-based energy production plants around Europe. Each player's turn consists of three phases. First, they earn income. Second, they make 1-3 purchases of new power networks or contracts. Finally, they move the shared surveyor piece along the built networks (paying other players for their share of the network they use), replacing the old power plant they end on with a new one. Each type of plant they replace gives a special ability or one-time benefit. The old plants are placed randomly on the board each game for a different puzzle every time.

At the end of the game, each player is rewarded with additional points based on the number of their plants in their largest network of connected cities. The player with the most points wins!

—description from publisher